Main Street Methodist Day Care 24 January 2006
I had to nearly threaten this group to get them to let me take their photo. Almost to a person, they are shy, and at this point just wanting to get back to base camp after a long day.
L-R: Beth, Carolyn, Peg, Cassandra, Stoddard, and Pete.
This tombstone is in the cemetery across the street from the back of the daycare center. I think it to be a very apt description of the crew who is working at Bay St. Louis, as they are a hard-working, quiet bunch.
At the end of the workday, Pete is not ready to go. While the others begin loading the van with equipment, Pete cuts a square in the drywall located in a closet. His intent is to prepare for installation of a child's sink and vanity. He tells me he thinks he can finish the job the next day, and has me take a closeup (not shown) so that he can show Jerry and explain what he plans to do.

Stoddard installs a bathroom stall.
L-R: Beth, Carolyn, Peg, Cassandra, Stoddard, and Pete.

This tombstone is in the cemetery across the street from the back of the daycare center. I think it to be a very apt description of the crew who is working at Bay St. Louis, as they are a hard-working, quiet bunch.

At the end of the workday, Pete is not ready to go. While the others begin loading the van with equipment, Pete cuts a square in the drywall located in a closet. His intent is to prepare for installation of a child's sink and vanity. He tells me he thinks he can finish the job the next day, and has me take a closeup (not shown) so that he can show Jerry and explain what he plans to do.


Stoddard installs a bathroom stall.

0 Comments:
Post a Comment
<< Home